Tarmac laid on curvy path to new Ouseburn Bridge

OuseburnPathTarmac3

Work on the new Ouseburn Bridge has been continuing, even in this awful weather.

Yesterday, fresh tarmac was laid on the long, curving path down to the river, linking up with the new bridge over the Ouseburn. Now railings are being added.

Here are some pix of the latest works.

OuseburnPathTarmac2

OuseburnPathTarmac1

Share the Post:

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Posts

Fake Moos? Cattle Run Was For People Not Cows

Funny, isn’t it, how once something becomes generally accepted it gets, well, accepted? Take Armstrong Park’s “cattle run”: according to an interpretation panel, this distinctive feature was sunk for bovine use by Victorian industrialist Lord Armstrong, writes Carlton Reid. The livestock, goes the story, were herded through this costly railway-style cutting because the route had long been used for leading cows to pasture.

Read More